Please rotate your phone
to portrait

Rotate your tablet

This experience is designed for landscape mode.

Sydsol
Let’s talk
Solar Studio · San Francisco

Salesforce Tower.
The tower pioneered blackwater reuse. Productive glazing can be the next first.

Salesforce Tower already uses 50% less energy per square foot than the median US office, sources 100% renewable electricity and operates the country’s largest on-site blackwater recycling system in a commercial high-rise. The right proposition is another first-of-kind building technology.

Read the building

Salesforce Tower helped redefine sustainable high-rises. Now redefine the façade.

Salesforce Tower already proves that major workplace infrastructure can become part of the innovation story. Productive glazing offers the next visible step: make the clear envelope itself generate electricity while reinforcing the tower’s identity as a technology-forward workplace.

Annual solar yieldSalesforce Tower · San Francisco
Loading city context…
Lower yieldHigher yield
Qualified solar surface
Outside commercial threshold
At a glance

What the building envelope could deliver

Qualified roof and façade surfaces are screened against the same energy and commercial assumptions used throughout this case study.

— Annual generation
— Annual energy value
— Modelled payback
— Grid-equivalent CO₂
— Installed solar area
— Project LCOE

Grid-equivalent CO₂ is modelled using the local grid factor. Actual market-based emissions impact depends on the building’s electricity procurement and renewable-energy contracts.

Energy & economics

Monthly electricity & LCOE

See how electricity generation and equivalent energy cost change through the year as solar resource, orientation and shading shift.

Monthly electricity & LCOE

Generation through the day

The envelope, not the roof, carries the tower.

Southeast and southwest façades provide roughly three quarters of modelled annual generation, while the roof contributes only a few percent. This is exactly the geometry where productive glazing becomes more than a rooftop extension.

A first-of-kind façade technology for a first-of-kind workplace.

Solar generation profile · month by month

Drag the month slider to move through the year.
Qualified surface mix

Where the electricity comes from

The model is overwhelmingly vertical, led by southeast and southwest. That concentration supports a clear flagship façade intervention rather than a conventional rooftop story.

—annual generation
Innovation as building identity

Make the next building technology part of the tower itself.

Salesforce Tower already proves that major workplace infrastructure can become part of the innovation story. Productive glazing offers the next visible step: make the clear envelope itself generate electricity while reinforcing the tower’s identity as a technology-forward workplace.

Already

Salesforce Tower already turns infrastructure into innovation.

LEED Platinum, renewable electricity, high energy performance and a first-of-kind blackwater system show that the tower is willing to make building infrastructure part of its identity.

→
Next standard

Pioneer productive glazing at flagship scale.

A transparent generation layer can become another building technology that visitors, employees and customers can physically see — aligned with a brand built around technology adoption.

First-of-kind precedent

Another flagship-scale first can live in the glass.

A façade pilot gives Salesforce a visible technology story that can begin on selected surfaces, prove performance in operation and scale from there.

Brand alignment

Make the headquarters embody the innovation Salesforce sells.

A productive façade lets the headquarters embody the same innovation and sustainability narrative Salesforce takes to customers.

Solar Studio result

The envelope, not the roof, carries the model.

Southeast and southwest façades together provide roughly three quarters of modelled annual generation; the roof contributes only a few percent.

Building ecosystem

Prominent organisations connected to this asset

Namesake occupier

Salesforce

Salesforce maintains 100% renewable-energy procurement for global operations and has made sustainability part of its core-value framework.

External references describe public building, owner and occupier context. Inclusion does not imply endorsement of Sydsol or participation in this study.

The Solar Studio advantage

We model the building.
Then we follow the sun.

Solar Studio reveals the energy potential hidden across an entire building envelope — not just the roof. It combines advanced 3D solar simulation with the commercial metrics asset owners need to make a decision.

01

Advanced 3D building model

We recreate the building and its urban surroundings so the analysis reflects the real geometry of the façade, roof and neighbouring skyline.

02

Sunlight, tracked all year

Advanced ray-tracing follows sunlight through every hour of the day and every season of the year, revealing how solar access changes across the envelope.

03

A true shading profile

Nearby towers, setbacks and the building itself are captured in a detailed shading profile, separating consistently productive surfaces from those that spend too much time in shadow.

04

From solar potential to business case

We translate the solar opportunity into generation, energy savings, carbon reduction and payback — turning a complex façade into a clear investment picture.

Beyond rooftop solar

See where the building can generate, when that energy arrives, and which surfaces create the strongest commercial value.

Case study settings

The assumptions behind this view

These inputs define the Salesforce Tower case study and can be changed for a building-specific assessment.

Assumptions & inputsOpen to review the model settings

Indicative feasibility assessment. Results support early-stage decision making and should be followed by site, structural, electrical and façade-engineering review before project development.

Explore a Sydsol pilot for Salesforce Tower.

We can turn this model into a site-specific pilot scope — target surfaces, expected generation, integration pathway and indicative economics.

Discuss a façade pilot ↗