Asia’s first LEED v5 O+M Platinum building.
ICC scored 91 under LEED v5, the highest score among the seven buildings certified worldwide at the time. SHKP reports electricity use in 2024 more than 20 million kWh below 2012.
Please rotate your phone
to portrait
This experience is designed for landscape mode.
ICC already operates at the leading edge of green-building management: LEED v5 O+M Platinum, AI-driven optimisation and more than 20 million kWh less electricity use than in 2012. The next story is not another efficiency certificate — it is physical generation on the flagship tower.
ICC has already set a benchmark for operating performance, while SHKP has built substantial solar capability across its properties. Sydsol brings those strengths together on the flagship: make one of Hong Kong’s most visible towers generate from its own envelope.
Qualified roof and façade surfaces are screened against the same energy and commercial assumptions used throughout this case study.
Grid-equivalent CO₂ is modelled using the local grid factor. Actual market-based emissions impact depends on the building’s electricity procurement and renewable-energy contracts.
See how electricity generation and equivalent energy cost change through the year as solar resource, orientation and shading shift.
Southwest is the single largest modelled contributor and southeast is second. Together they carry roughly four fifths of annual output, with the roof a smaller supporting surface.
The opportunity is strongly concentrated on the southwest and southeast façades. That makes the project easier to frame as a deliberate architectural layer rather than all-over coverage.
ICC has already set a benchmark for operating performance, while SHKP has built substantial solar capability across its properties. Sydsol brings those strengths together on the flagship: make one of Hong Kong’s most visible towers generate from its own envelope.
ICC scored 91 under LEED v5, the highest score among the seven buildings certified worldwide at the time. SHKP reports electricity use in 2024 more than 20 million kWh below 2012.
The opportunity is less about proving sustainability and more about setting the next physical benchmark for dense vertical cities.
ICC uses AI, IoT, digital-twin and data-driven building management. On-site generation adds a new physical input to an already intelligent operating platform.
The group reports a large network of solar panels across managed properties and construction sites. ICC can become the high-rise flagship of that capability.
Southwest and southeast surfaces together produce roughly 80% of modelled annual generation. The opportunity is concentrated and architecturally legible.
External references describe public building, owner and occupier context. Inclusion does not imply endorsement of Sydsol or participation in this study.
Solar Studio reveals the energy potential hidden across an entire building envelope — not just the roof. It combines advanced 3D solar simulation with the commercial metrics asset owners need to make a decision.
We recreate the building and its urban surroundings so the analysis reflects the real geometry of the façade, roof and neighbouring skyline.
Advanced ray-tracing follows sunlight through every hour of the day and every season of the year, revealing how solar access changes across the envelope.
Nearby towers, setbacks and the building itself are captured in a detailed shading profile, separating consistently productive surfaces from those that spend too much time in shadow.
We translate the solar opportunity into generation, energy savings, carbon reduction and payback — turning a complex façade into a clear investment picture.
See where the building can generate, when that energy arrives, and which surfaces create the strongest commercial value.
These inputs define the International Commerce Centre case study and can be changed for a building-specific assessment.
Indicative feasibility assessment. Results support early-stage decision making and should be followed by site, structural, electrical and façade-engineering review before project development.
We can turn this model into a site-specific pilot scope — target surfaces, expected generation, integration pathway and indicative economics.